Multi-market mitigation
5 markets, Northwest · ~900 claims a year
WIP documentation QA
One auditor, a former technician and project manager, checked every open file by hand: five or six passes on each job across a five-day dry-out, with 30 to 50 open files in each market. A gap found after the equipment was pulled could no longer be fixed, and the carrier cut the bill. Documentation and dry-log problems had one market more than three weeks behind on billing.
Every night, Ruby audits each open job against eleven rules the auditor set with us and the field standard the shop follows. She reads the notes, opens the photos and checks the dry logs: whether every visit has notes, photos and readings that agree, whether visits kept their cadence, whether equipment counts and moves add up, and whether the final file is complete. The auditor starts the day with a worst-first list across all five markets and the fix for each gap. Ruby only reads the job file; the auditor makes every change.
Documentation gaps were costing 5.3 points of margin
63% of 250 closed claims carried a gap; those collected 5 points lower and 13 days later. On $10M of billing, about $500k a year is at stake.